logo hardy animation
logo hardy animation
Budget
Confidential
Clients
Glencore : Fonderie Horne
Location
Rouyn-Noranda, (Qc)
Year
2016
Professionals
Glencore // Aramture Nationale
Horne Foundry in Rouyn-Noranda

Renovation of a section of the T-350 industrial channel for Glencore’s Horne Foundry in Rouyn-Noranda: dismantling of the existing structure and construction of a new reinforced concrete channel, carried out at an active site without interrupting the foundry’s operations.

_____________________________________________________________________________________

At the Horne Foundry in Rouyn-Noranda, Hardy Construction carried out the rehabilitation of a section of the T-350 industrial channel, a collection system that carries process fluids. The scope of work included the excavation and dismantling of the existing channel, the removal of decommissioned pipes, the construction of a new

concrete channel, and the restoration of traffic lanes. The main challenge lay in carrying out the work in the heart of an active industrial site: keeping critical pipelines operational, phasing the work into two distinct zones, closely managing pedestrian and vehicle traffic, and fully complying with Glencore’s safety requirements.

Contact Us
crossmenu
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.