logo hardy animation
logo hardy animation

Floor area
21 600 sq. ft.
Budget
3.7 million
Clients
Drilling
Location
Amos, QC
Year
2017-2018
Construction Drilling Roller

Looking for a more functional workspace, Rouillier Drills announced in 2017 the investment of several million in the construction of a new building. The company used Hardy Construction's skills to design and build its new head office.

The building has a bold and unique design, where angles are used. They can be seen in several places, both in the coatings and in the structure.

The entrance hall stands out with its cornered curtain wall surrounded by copper diamond tiles. The wooden columns mark the entrance and terrace of the second floor.

According to the Hardy Construction team, the building itself is an architectural marvel.

Contact Us
crossmenu
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.